Project Management

We take Project Management very
seriously at Wastech.
Once your project has been confirmed with
a purchase order, Wastech management and engineers will begin the
process of project management. We will manage your project with
openness, professionalism, and a sense of urgency. We will work in close
communication and collaboration with your team to avoid surprises. These
initial steps will be taken immediately:
- An experienced Project Manager is
assigned to your project.
- A Project Number is assigned.
- A password protected FTP folder is
opened on the Internet for your use 24/7.
- The Project Quality Plan (PQP) is
initiated by the Project Manager.
- A Kickoff Meeting is scheduled.
Our Engineering Team will complete the
engineering
package with mechanical and electrical drawings for your approval prior
to fabrication. A Factory Acceptance Test (FAT) or On-site Performance
Acceptance Test will be developed and sent with the drawings for your
review and approval.

A special FTP (File Transfer
Protocol) folder will be set up online for your project, accessible only with
your special user name and password.
The FTP folder will contain the updated
schedule, most
current drawings and bill of materials, draft of the O&M manual, final FAT and performance
test criteria, and daily digital pictures of the
product as it progresses through our shop. Any design, purchasing,
fabrication or delivery issues will be visible to you on the FTP site.
 |
 |
|
Day 6 --
Fabrication as shown on Wastech's FTP site. |
Take a look at project documentation in the
sample FTP (File Transfer Protocol) folder
ftp://ftp.wastechengineering.com. Use "wastech" as the
user name and password.
With Wastech Engineering, you're always
part of the team. Your continual involvement will help assure success of
your project.
|